Performance of Steel Pipe Pile-to-Concrete Cap Connections Subject to Seismic or High Transverse Loading: Phase III

The Montana Department of Transportation has released a report that investigates the efficacy of a new procedure developed to design concrete filled steel tube (CFT) piles to concrete pile cap connections.

Read the Report

 

This entry was posted in Bridge Design/Const., Bridge Pres. Apps., General News, New Technology, News. Bookmark the permalink.

Comments are closed.