The U.S. Federal Highway Administration has released a tech brief that assesses the after-fracture internal and structural redundancy of a two-line, simple-span truss bridge that was slated for explosive demolition.
Partnership Meetings
The U.S. Federal Highway Administration has released a tech brief that assesses the after-fracture internal and structural redundancy of a two-line, simple-span truss bridge that was slated for explosive demolition.