Sacrificial Osterberg Cell (O-Cell) To Confirm Load Design

The Montana Department of Transportation has released a report that describes a static load test that was carried out on a new bridge by using Osterberg load cell technologies and procedures. This is a large file and may take a few minutes to load.

Read the Report

This entry was posted in Bridge Design/Const., Bridge Pres. Apps., General News, New Technology, News, Studies / Reports. Bookmark the permalink.

Comments are closed.