Quantifying the Likelihood of Barrier Strike Maintenance

The New Zealand Transport Agency has released a report that investigates the occurrence and corresponding maintenance costs associated with vehicle strikes on W-beam and wire rope barrier installations on on bridges.

Read the Report

This entry was posted in Bridge Design/Const., Bridge Pres. Apps., New Technology, News, Studies / Reports. Bookmark the permalink.

Comments are closed.