Investigation of Techniques for Accelerating the Construction of Bridge Deck Overlays

The Institution for Transportation at Iowa State University has released a report that investigates possibilities for decreasing the construction time of bridge deck overlays, which involves replacing the deteriorated part of the deck so as to extend bridge life.

Read the Report

This entry was posted in Bridge Design/Const., Bridge Pres. Apps., General News, New Technology, News, Studies / Reports. Bookmark the permalink.

Comments are closed.