Skip to content
Home
Technical
AASHTO
Administrative
ASCE
Bridge Preservation
Contracts
Coatings
General
Concrete
Construction
Design
Decks & Joints
FHWA
Pocket Guides
BPETG under FHWA
Maintenance & Inspection
Performance Measures
Policy
FHWA
Steel
Design
Substructures
Surveys
Tunnels
Working Group Products
Bridge Special Provisions
Research
Research Updates & Search Engine
Asset Management
Inspection
Materials
Decks
TRB AKT60 Standing Committee on Bridge Preservation
Legislative
Training
Library
Videos & Powerpoint Presentations
News Archive
Industry
In the News
Innovation
People on the Move
New Projects
New Case Studies
Virtual Demonstrations
Bridge News
Site Map
Category Archives:
General News
2017-03-24
American Society of Civil Engineers — Report on America’s Infrastructure
2017-01-25
Current Practices and Guidelines for the Reuse of Bridge Foundations
2017-01-17
Bridge Design Effort and Cost Estimation Models – Phase I
2017-01-17
Development of Guidelines for Transportation of Long Prestressed Concrete Girders
2017-01-13
Post-Extreme Event Damage Assessment and Response for Highway Bridges
2016-12-20
RFP: Update of the AASHTO LRFD Movable Highway Bridge Design Specifications
2016-12-15
Development of an Intrinsically Conducting Polymer-Based Low-Cost, Heavy-Duty, and Environmentally-Friendly Coating System for Corrosion Protection of Structural Steels
2016-12-14
Bridge Assessment for High Productivity Freight Vehicle Access: Guidelines on Processes and Procedures
2016-12-14
Underwater Noise Reduction of Marine Pile Driving Using a Double Pile: Vashon Ferry Terminal Test
2016-12-14
Ensuring Accurate Load Ratings for Shear in Bridges with Prestressed Concrete Girders
2016-12-13
RFP: Proposed AASHTO Bridge Guidelines for Use of ASTM A1010 Steel
2016-12-05
Maryland Gov. Hogan Announces $765M Plan to Replace US301 Bridge Over Potomac
2016-11-30
Structures
2016-11-30
RFP: Design and Construction of Deck Bulb Tee Girder Bridges with UHPC
2016-10-26
Economic Impact of Multi-Span, Prestressed Concrete Girder Bridges Designed as Simple Span versus Continuous Span
2016-10-26
Investigation of Shear Distribution Factors in Prestressed Concrete Girder Bridges
2016-10-26
Long-Term Bridge Performance (LTBP) News: September 2016
2016-10-21
Effective Implementation of Ground Penetrating Radar for Condition Assessment and Monitoring: Phase 2
2016-10-05
Purdue engineering professor developing open-ended pipe pile for bridge construction
2016-10-05
Arizona DOT Eyes November Opening of Bridge Over Yuma Area’s Fortuna Wash
2016-10-04
Using Building Information Modeling to Track and Assess the Structural Condition of Bridges
2016-10-04
Design and Capacity Assessment of External Shear Keys in Bridge Abutments
2016-09-14
Self-Consolidating Concrete for Cast-in-Place Bridge Components
2016-09-13
Long-Term Bridge Performance Committee Letter Report: July 5, 2016
2016-09-13
RFP: Proposed Modification to AASHTO Cross-Frame Analysis and Design
2016-09-08
New Hampshire, Maine DOTs Permanently Close Sarah Long Bridge to Vehicle Traffic
2016-08-23
Optimizing the Use of the Thermal Integrity System for Evaluating Auger-Cast Piles
2016-08-23
Implementation of the 2013 AASHTO Manual for Bridge Element Inspection
2016-08-18
Along for the Ride: The road to getting a bridge built
2016-08-17
Texas Officials Launch $930M Project to Replace Corpus Christi Harbor Bridge
←
Older posts
Search for:
Partnership Meetings
2023 WBPP 3/14-3/16
Albuquerque, NM
2023 SEBPP 4/4-4/6
Atlanta, GA
2023 NEBPP 8/22-8/24
Wilmington, DE
2023 MWBPP 10/17-10/19
Deadwood, SD