517-432-8220 ncpp@egr.msu.edu

Long-Term Bridge Performance Committee Letter Report: February 20, 2015

  On February 20, 2015, TRB’s Long-Term Bridge Performance (LTBP) Committee sent its fifth letter report to Gregory Nadeau, acting administrator of the Federal Highway Administration (FHWA). The committee provides advice and assistance on the conduct of the LTBP program, which is designed to collect research-quality data on a large representative sample of in-service U.S. highway bridges and to…

Read More

Experimental Investigation of the Effect of Surface Markings on the Mechanical Integrity of Weathering Bridge Steels

The Florida Department of Transportation has released a report that describes a micro-structural evaluation of 50W weathering steel on bridges so as to understand and characterize the effect of the scribe markings on micro-structural evolution and mechanical properties. Read the Report

Read More

Bond Behavior of Reinforcing Steel in Ultra-High Performance Concrete

The U.S. Federal Highway Administration has released a report that explains the potential of using ultra-high performance concrete-class materials to anchor or lap splice deformed reinforcing bars in field-cast connections as a means to simplify connection details in some prefabricated bridge systems. Read the Report

Read More

Seismic Performance of Circular Reinforced Concrete Bridge Columns Constructed with Grade 80 Reinforcement

The Oregon Department of Transportation has released a report that assesses the behavior of circular reinforced-concrete bridge columns constructed with Grade 80 reinforcing steel meeting ASTM A706 specifications subjected to reversed cyclic lateral loading. Read the Report

Read More

Wind Tunnel Investigations of an Inclined Stay Cable with A Helical Fillet

The U.S. Federal Highway Administration has released a report that develops design guidance for mitigation of excessive cable vibrations on cable-stayed bridges. The study includes wind tunnel testing to evaluate the influence of damping, turbulence, and aerodynamic surface treatment on cable stability. Read the Report

Read More

Proposed Guideline for Reliability-Based Bridge Inspection Practices

TRB’s National Cooperative Highway Research Program (NCHRP) Report 782: Proposed Guideline for Reliability-Based Bridge Inspection Practices presents a proposed guideline for reliability-based bridge inspection practices and provides two case studies of the application of the proposed guideline. The guideline describes a methodology to develop a risk-based approach for determining the bridge inspection interval according to the requirements in Moving…

Read More

Review of Axle Spacing Mass Schedules and Future Framework for Assessment of Heavy Vehicle Access Applications

Austroads has released a report that demonstrates the development of an assessment framework to allow fast assessment of simply supported bridges by using a simple line model comparison approach. This report is available for no fee after logging on to the site. Read the Report

Read More

OIG Report Targets FHWA’s Implementation of MAP-21 Bridge Provisions

AASHTO Journal, 29 August 2014 The Federal Highway Administration has made progress toward fully implementing safety provisions included in the 2012 MAP-21 surface transportation bill but the agency has much more to do, according to a new Office of Inspector General report released this week. According to the report, which was requested by House Transportation and Infrastructure Ranking Member…

Read More

Tools for Determining Yield Stress of In-Service Gusset Plates

TRB’s National Cooperative Highway Research Program (NCHRP) Innovations Deserving Exploratory Analysis (IDEA) Final Report for NCHRP-IDEA Project 161:Tools for Determining Yield Stress of In-Service Gusset Plates explores a nondestructive testing device that can estimate the yield stress of bridge steel plates. Project: Project Information Project Number: 20-30/IDEA 161 Read the Report

Read More

Innovative Bridge Designs for Rapid Renewal

TRB’s second Strategic Highway Research Program (SHRP 2) S2-R04-RR-1: Innovative Bridge Designs for Rapid Renewal documents the development of standardized approaches to designing and constructing complete bridge systems for rapid renewals. The report also describes a demonstration project on US 6 over the Keg Creek near Council Bluffs, Iowa that was completed in 2011 using the accelerated bridge construction…

Read More

NTSB Issues Final Report on Washington State Bridge Collapse

AASHTO Journal, 8 August 2014 The well-publicized collapse of an interstate bridge north of Seattle last year was the result of “a series of deficiencies in a system intended to safeguard the passage of oversized loads over Washington State’s roadways” according to the National Transportation Safety Board, which released its final report on the incident last month. A truck…

Read More

Questions?

Contact us for more information.