517-432-8220 ncpp@egr.msu.edu
Menu
  • Research ⮟
    • Research Updates & Search Engine
    • Asset Management
    • Materials
    • Inspection
    • Materials
    • Decks
    • TRB AKT60 Standing Committee on Bridge Preservation
  • Technical ⮟
    • AASHTO
    • General
    • Coatings
    • Decks & Joints
    • Maintenance & Inspection
    • Performance Measures
    • Substructures
    • Surveys
    • Tunnels
  • Legislative
  • Training
  • Industry
    • ITD – Innovative Technology Demonstrations
    • BP-ETG under Technical
    • Virtual Demonstrations
    • Bridge News
  • Working Groups ⮟
    • Regional / National Working Groups
    • Working Group Products
    • Local Agency – Outreach & Training
    • Pocket Guides
    • Bridge Blog
    • Bridge Product Database
Apply Online

Investigation of Techniques for Accelerating the Construction of Bridge Deck Overlays

2016-05-17
| No Comments

The Institution for Transportation at Iowa State University has released a report that investigates possibilities for decreasing the construction time of bridge deck overlays, which involves replacing the deteriorated part of the deck so as to extend bridge life.

Read the Report

Categories: Bridge Design/Const., Bridge Pres. Apps., General News, New Technology, News, Studies / Reports

Post navigation

← Load Rating and FRP Retrofitting of Bridge Abutment Timber Piles
Governor McCrory (NC) Applauds Bonner Bridge Construction Milestone →

Partnership Meetings

2025 Meeting List

Bridge Preservation Blog
Technical Exchange

Technical Exchange

Technical Exchange

Bridge Product Database

Questions?

Contact us for more information.

Contact Us
Contact Us
Email:  ncpp@egr.msu.edu
Phone:  (517) 432-8220
Address
2857 Jolly Road
Okemos, MI 48864
Map
Hours of Operation
8 am - 5 pm
Eastern Time
NCPP 2024