Testing Protocol for Predicting Driven Pile Behavior within Pre-bored Soil

The Louisiana Department of Transportation and Development has released a report that discusses testing protocols for pre-boring—a method used in the construction of highways and bridges to facilitate the driving of displacement piles through hard/dense soils.

Read the Report

This entry was posted in Bridge Design/Const., Bridge Pres. Apps., General News, New Technology, News, Studies / Reports. Bookmark the permalink.

Comments are closed.